ROOF PREPARATION





                                                                                                            JULY 2025






                          Westform’s Prolok 12 & 16 profile can be used in both new and old construction. We recommend
                   Prolok be installed over a solid substrate, installation over strapping is possible. The following steps should

            be taken to prepare the roof for installation of any roof panel.


            1. Make sure there are no nails or other objects that
            might puncture the underlayment of the roof panels.


            2. Check/plan all details for possible roof penetrations which
            must be added to the roof prior to roof panel installation.
            (vented ridge/vented end wall - plumbing stacks)


            3. Cover the roof deck with underlayment, overlaying 6”, check manufacturers installation manual for underlayment. When

            installing over strapping, run the underlayment parallel with the metal panels, making sure that the underlayment is tight.


            4. Snap a chalk line along the gable end where the first panel will be installed. This line should be the width of the panel
            + 1/2” away from the edge of the roof and square with the eave. Use the 3-4-5 method to square the roof. Use the largest
            3-4-5 increments that will fit on the roof plane.


            3-4-5 Right Angle Squaring Method
                       5-10-15
           3-6-9
                 90 0
                    4-8-12








            EXISTING ROOF


            In some cases metal roofing can go over existing roofing. For those roofs use 1 x 4 strapping on 16” O.C. screwed through to

            the rafters. The minimum pitch for Prolok 12 & 16 is a 2/12 pitch.



            1. Remove moss and debris, inspect the roof for damage, make any necessary repairs, secure any warped or loose sheeting.

            2. Remove current venting and prepare for continuous profile ridge venting.

            3. Screw down 1 x 4 on 16” O.C.

            4. Install underlay parallel with the panels, making sure the underlayment is tight.